SECTION 153 OF THE PLANNING ACT 2008

REGULATION 6 OF THE INFRASTRUCTURE PLANNING (CHANGES TO, AND REVOCATION OF, DEVELOPMENT CONSENT ORDERS) REGULATIONS 2011 NOTICE OF APPLICATION TO MAKE A NON-MATERIAL CHANGE TO THE FOLLOWING DEVELOPMENT CONSENT ORDER:

THE DOGGER BANK TEESSIDE A AND B OFFSHORE WIND FARM ORDER 2015 (AS AMENDED) (SI 2015/1592)

1 An application has been made by Doggerbank Offshore Wind Farm Project 3 Projco Limited to the Secretary of State for Energy Security and Net Zero to make a non-material change to the above mentioned Development Consent Order (the DCO).

2 The DCO granted development consent to Doggerbank Project 2 Bizco Limited for ‘Project A’ and Doggerbank Project 3 Bizco Limited for ‘Project B’ – two offshore wind turbine generating station each comprising up to 200 wind turbine generators and associated development in the Dogger Bank Zone and the Borough of Redcar and and Cleveland. Doggerbank Project 2 Bizco Limited has been renamed at Companies House as Doggerbank Offshore Wind Farm Project 3 Projco Limited (Project 3 Projco) and Project A has been renamed Dogger Bank C (herein ‘DBC’). Doggerbank Project 3 Bizco Limited has been renamed at Companies House as Sofia Offshore Wind Farm Limited (SOWFL).  This application is made by Project 3 Projco and relates only to DBC.

3 The application seeks to make non-material changes to the drafting of the DCO to increase the maximum hammer energy for pin-piles from 1,900 kJ to 3,000 kJ for the Offshore Substation Platform (OSP) at DBC.

4. The application documents are available for inspection on the National Infrastructure Planning Portal (DBC and Sofia Offshore Wind Farm page) here: https://infrastructure.planninginspectorate.gov.uk/ projects/yorkshire-and-the-humber/dogger-bank-teesside-a-sofia- offshore-wind-farm-formerly-dogger-bank-teesside-b-project-previously- known-as-dogger-bank-teesside-ab/?ipcsection=overview. Click on the Documents tab and then click on Decided in the documents navigation area.

A free digital COPY of the application documents can also be obtained using the following contact details: Doggerbank Offshore Wind Farm Project 3 Projco Limited at No.1 Forbury Place, 43 Forbury Road, Reading, United Kingdom, RG1 3JH or at DBCCONSENTS@sse.com or call 01738 341343.

5. Please send any representations about the application by email to the Planning Inspectorate at DBTEESSIDEAB@PLANNINGINSPECTORATE.GOV. UK or in writing to: Major Applications & Plans, The Planning Inspectorate, Temple Quay House, Temple Quay, Bristol BS1 6PN. Please quote reference [Dogger Bank C] on any correspondence. Please note that any representations received by the Planning Inspectorate in response to the consultation will be handled in compliance with the European Union’s General Data Protection Regulation and published on the Planning Inspectorate’s Infrastructure Planning Portal (https:// infrastructure.planninginspectorate.gov.uk) with all personal information removed.

6. The deadline for receipt of representations is 6th October 2024.

Doggerbank Offshore Wind Farm Project 3 Projco Limited

SubscribeSubscribe
SUBSCRIBE & SAVE!

Subscribe to Fishing News magazine today; never miss an issue and save 55%!