Parkol Marine Engineering

  • Four new Parkol builds

    Four new Parkol builds

    6th July 2017

    Whitby boatbuilder Parkol Marine Engineering currently has four new fishing vessels in varying stages of build, marking a significant first, reports David Linkie. Above: Framing the engineroom section of a 26m pair-seiner, similar to Victory Rose. Fabrication work in progress for…

  • Extensive work schedule for Parkol Marine Engineering

    Extensive work schedule for Parkol Marine Engineering

    25th April 2017

    Whitby boatbuilders Parkol Marine Engineering currently have three new vessels at varying stages of build, at the same time as carrying out a wide range of refit work, including a large-scale modernisation project on the Newlyn beamer Trevassa IV, reports…

  • Advance returns to sea after refit

    Advance returns to sea after refit

    15th May 2016

    Parkol Marine Engineering recently completed extensive modernisation work on the Campbeltown 87 pair-seiner Advance WY 77, owned by Lockers Trawlers Ltd, reports David Linkie. Parkol engineers installed a new Baudouin 12M26.2 main engine (428kW @ 1500rpm), Masson MM7400 8.653:1 reduction gearbox and…

  • Building for the future: new over 15m boats – part 1

    Building for the future: new over 15m boats – part 1

    26th February 2016

    The number of new over 15m boats currently on order is at the highest level since the millennium. In the next two years, nearly 20 new bespoke builds are scheduled to join the UK fleet. This number of new boats…

  • Boat News

    3rd February 2016

    Dave Linkie gives a round up of the latest boat news across the UK… Fraserburgh skipper orders 24m trawler with Whitby yard – Fraserburgh skipper Stephen West, of MB Good Design LLP, has placed an order for a new design of…

Great reasons to subscribe:
  • Keeping up with the week’s most essential fishing news
  • Up to 55% saving on the normal subscription price
  • Every issue delivered in 100% plastic-free packaging