SECTION 48, PLANNING ACT 2008

REGULATION 4, THE INFRASTRUCTURE PLANNING (APPLICATIONS: PRESCRIBED FORMS AND PROCEDURE)

REGULATIONS 2009 NOTICE PUBLICISING A PROPOSED APPLICATION FOR A DEVELOPMENT CONSENT ORDER TO CONSTRUCT AND OPERATE EAST ANGLIA TWO OFFSHORE WINDFARM

Notice is hereby given that East Anglia TWO Limited of 3rd Floor 1 Tudor Street, London, EC4Y 0AH (“the Applicant”) intends to apply to the Secretary of State for a Development Consent Order (“DCO”) under section 37 of the Planning Act 2008 for the construction and operation of the East Anglia TWO Offshore Windfarm, an offshore wind generating station, located approximately 31km from Lowestoft and 32km from Southwold and covering an area of approximately 255km2, together with associated development to connect the generating station to the national grid.

The proposed DCO would, amongst other things, authorise:

  • Up to 75 offshore wind turbines and their foundations with a maximum hub height of 175m above lowest astronomical tide (LAT), maximum rotor diameter of 250m and maximum tip height of up to 300m above LAT;
  • Up to four High Voltage Alternating Current (HVAC) offshore electrical platforms and their foundations to aggregate the power from the wind turbines and convert it into a suitable form for export to shore;
  • Up to one offshore construction, operation and maintenance platform and its foundations;
  • Up to one offshore meteorological mast and its foundations;
  • Subsea cables connecting the wind turbines, the meteorological mast and offshore platforms;
  • Up to two offshore subsea export cables to bring electricity from the offshore electrical platforms to landfall located north of Thorpeness in Suffolk;
  • Works at landfall to connect the offshore export cables to the onshore cables including transition bays;
  • Up to six underground cables and up to two fibre optic cables, of approximately 9km in length, with jointing pits, commencing at the landfall and running in a northern direction towards Sizewell Gap, turning to a south westerly direction towards the B1122 (south of Aldringham), turning to a westerly direction towards Grove Road, and turning north to the onshore substation;
  • A new onshore substation in the vicinity of Grove Wood, Friston and a connection into the National Grid infrastructure;
  • National Grid infrastructure in the vicinity of Grove Wood, Friston to facilitate a connection into the main transmission network including a new National Grid substation and National Grid overhead line realignment works;
  • Associated or ancillary works including improvements to highways, verges and private access roads, construction compounds, construction of a temporary haul road, landscaping and drainage works;
  • If required, the permanent and/or temporary compulsory acquisition of land and/or rights and overriding of easements and other rights over or affecting land;
  • If required, the temporary stopping up, alternation or diversion of streets;
  • The application and/or disapplication of legislation including inter alia legislation relating to compulsory purchase; and
  • Such ancillary, incidental and consequential provisions, permits or consents as are necessary and/or convenient.

The proposed works are an environmental impact assessment (“EIA”) development for the purposes of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017. This means that the proposed works constitute development for which an Environmental Impact Assessment is required and the proposed application for a DCO will be accompanied by an Environmental Statement. The Applicant has prepared Preliminary Environmental Information which contains documents, plans and maps showing the nature and location of the East Anglia TWO Offshore Windfarm and which can be inspected free of charge from 11th February 2019 until 26th March 2019 at the locations and times set out below.

Venue Opening Hours
Leiston Town Council

Council Offices

Main Street

Leiston

Suffolk

IP16 4ER

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

0900 – 1230, 1400 – 1645

0900 – 1230, 1400 – 1645

Closed

0900 – 1230

0900 – 1230

Closed

Closed

Aldeburgh Library

32 Victoria Road

Aldeburgh

Suffolk

IP15 5EG

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

0900 – 1300

0900 – 1300

0900 – 1300, 1500 – 1800

0900 – 1300

0900 – 1300

1000 – 1230, 1300 – 1530

1000 – 1230, 1300 – 1530

Woodbridge Library

New Street

Woodbridge

Suffolk

IP12 1DT

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

1000 – 1600

0930 – 1930

0900 – 1730

0900 – 1730

0900 – 1930

0900 – 1700

1000 – 1600

Suffolk County Council

Endeavour House

8 Russell Road

Ipswich

Suffolk

IP1 2BX

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

0900 – 1700

0900 – 1700

0900 – 1700

0900 – 1700

0900 – 1700

Closed

Closed

Orbis Energy Centre

Orbis Energy Centre

Wilde St

Lowestoft

NR32 1XH

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

0830 – 1700

0830 – 1700

0830 – 1700

0830 – 1700

0830 – 1700

Closed

Closed

A reasonable copying charge may be made for the reproduction of information. Further details in relation to the Project and a copy of the Preliminary Environmental Information and other documents referred to above can also be found on the Applicant’s website https://www.scottishpowerrenewables.com/pages/east_anglia_two.aspx

Public Information Days will also be held by the Applicant on the following dates and locations:

Date Town/Village Address Time
16/02/2019 Friston Friston Village Hall, Church Road, Friston, Saxmundham, IP17 1PU 1000 – 1600
18/02/2019 Aldeburgh Aldeburgh Church Hall, Victoria Road, Aldeburgh, IP15 5EA 1400 – 1900
20/02/2019 Leiston Sizewell Sports and Social Club, King George’s Avenue, Leiston, IP16 4JX 1400 – 1900
21/02/2019 Orford Town Hall, Market Hill, Orford, Woodbridge, IP12 2NZ 1400 – 1900
22/02/2019 Knodishall Knodishall Village Hall, School Road, Knodishall, IP17 1UD 1400 – 1900
23/02/2019 Thorpeness Thorpeness Country Club, The Benthills, IP16 4NU 1000 – 1600
25/02/2019 Southwold Stella Peskett Hall, Mights Road, Southwold, IP18 6BE 1400 – 1900
27/02/2019 Friston Friston Village Hall, Church Road, Friston, Saxmundham, IP17 1PU 1400 – 1900
28/02/2019 Thorpeness Thorpeness Country Club, The Benthills, IP16 4NU 1400 – 1900
01/03/2019 Aldeburgh Aldeburgh Church Hall, Victoria Road, Aldeburgh, IP15 5EA 1400 – 1900
02/03/2019 Knodishall Knodishall Village Hall, School Road, Knodishall, IP17 1UD 1000 – 1600
04/03/2019 Southwold Stella Peskett Hall, Mights Road, Southwold, IP18 6BE 1400 – 1900
09/03/2019 Leiston Sizewell Sports and Social Club, King George’s Avenue, Leiston, IP16 4JX 1000 – 1600

Any response or representation to the publication of this notice must be made in writing to:

ScottishPower Renewables East Anglia TWO, RTLY-RLGH-GKSE FREEPOST, 25 Priestgate, Peterborough, PE1 1JL

or via email at: eastangliatwo@scottishpower.com

Responses must (i) be received by the Applicant on or before 26th March 2019 (ii) be made in writing, (iii) state the grounds of the response or representation and (iv) indicate who is making the response or representation, and (v) give an address to which correspondence relating to the response or representations may be sent.

Consultation responses may be made publicly available; however, the Applicant will not share individuals’ data (although the Applicant may indicate the general area of an individual’s location for context).scottish power renewables logo